LOGISTICS & STORAGE

Storage, Packing & Delivery Support

Before shipment, LEHUNDI checks the main machine, cutters, clamps, cables, tools and documents according to the equipment configuration, then uses protective packing to reduce damage and missing parts during transportation.

LEHUNDI industrial equipment storage and packing preparation area
48h

Common Spare Parts Response

Spare Parts Check & Shipment Preparation

For pipe beveling, cutting-beveling, plate beveling, welding support and on-site industrial equipment, we check the machine, accessories, wear parts and documents before shipment, helping customers prepare for installation and operation more efficiently.

Protective Packing

Wooden cases, cushioning materials and fixing measures are used according to equipment structure and transport method.

Packing List Check

Machines, cutters, clamps, cables, tools and documents are checked before shipment to reduce missing parts on site.

Delivery Records: Packing & Dispatch

Before dispatch, equipment is checked, packed and recorded to support installation, after-sales service and spare parts follow-up.

LEHUNDI industrial equipment wooden case packing and protective fixing
Delivery Step: Packing

Wooden Case Packing

Wooden cases, moisture-proof film, cushioning materials and fixing measures are used according to equipment structure to reduce impact and loosening risks during transport.

LEHUNDI industrial equipment accessories and document checking
Delivery Step: Checking

Accessories & Documents Check

Before shipment, the main machine, cutters, clamps, cables, tools and documents are checked to reduce waiting time during customer installation.

LEHUNDI industrial equipment dispatch and loading preparation
Delivery Step: Dispatch

Dispatch & Loading Preparation

After packing and shipment records are completed, the equipment enters the dispatch process and is prepared for loading or logistics handover according to the transport method.